Welcome to ARCO!Customer Login

English   Chinese

Service hotline:17181889999

Heating application

Factory and office

Current location: Home-Factory and office

Sichuan-tibet Railway Lalin Line High-speed Railway Station Heating Project

Release time:2023/11/20 15:00:50 Clicks:41 times 【Return】

The National Key Project, is an important component of the Sichuan Tibet Railway. It can connect the three important cities of Lhasa, Shannan and Nyingchi in Xizang, drive the economic development along the line, promote the construction of new urbanization, and inject new vitality into the economic and social development of Xizang. The main line of the Lhasa-Nyingchi Line Railway has a total length of 435.5 kilometers, with a newly built main line of 403.1 kilometers. It is a single track electrified Class I railway, with a designed driving speed of 160 kilometers per hour. 34 new stations will be built along the entire line, with 17 stations initially opened. With the basic completion of electrification construction, the pace of the Fuxing Hao entering Tibet is getting closer and closer. At the same time, the ARCO’s ultra-low temperature CO2 air source heat pump is also about to begin service at various stations on the Lhasa-Nyingchi Line. The CO2 air source heat pump used in this project is independently developed by ARCO, and has been tested by national authorities. It is an environmentally friendly, energy-saving, and efficient heat pump product specifically designed for high-altitude areas, providing warmth protection for passengers during winter travel.

Home About ARCO Heating application Refrigeration appliction Intelligence control application Products Consulting Service

The copyright owner is Heilongjiang ARCO Technology Ltd.
黑ICP备15009800号-1

Add:No. 130-2 Nanma Road, Daowai District, Harbin City, Heilongjiang Province
Tel:0451-82804111   Fax:0451-82614111
E-mail: admin@arcochina.com