Welcome to ARCO!Customer Login

English   Chinese

Service hotline:17181889999

Heating application

Factory and office

Current location: Home-Factory and office

Jilin Expressway Service Area Heating Project

Release time:2015/12/31 9:17:46 Clicks:1907 times 【Return】

The project is located in Jilin Province and is an expressway service area, with a heating area of approximately 3,600m2. If a regular air conditioning unit is selected for this plan, additional electrical auxiliary equipment is required, which will cause insufficient electric capacity, pose safety risks to electricity consumption, and require very high electricity bills. Based on the customer's needs and heat load, and considering factors such as low average outdoor temperature in winter (extremely cold temperature -30℃) and high air humidity that is prone to frost formation, 4 ARPCO2H100S units were selected for heating capacity at -15℃. The water supply temperature is 65℃, and the return water temperature is 40℃. It provides users with domestic hot water and underfloor heating, replacing the traditional coal-fired boiler method, ordinary air conditioning units and electric auxiliary methods, creating a comfortable and environmentally friendly new heating method.


Home About ARCO Heating application Refrigeration appliction Intelligence control application Products Consulting Service

The copyright owner is Heilongjiang ARCO Technology Ltd.
黑ICP备15009800号-1

Add:No. 130-2 Nanma Road, Daowai District, Harbin City, Heilongjiang Province
Tel:0451-82804111   Fax:0451-82614111
E-mail: admin@arcochina.com