Welcome to ARCO!Customer Login

English   Chinese

Service hotline:17181889999

Heating application

Factory and office

Current location: Home-Factory and office

Harbin Factory Reconstruction Project

Release time:2015/12/31 9:18:19 Clicks:1726 times 【Return】

The project belongs to the central heatingreconstruction project, the original factoryused coal boiler to meet the demand of heating winter. After reconstruction,  we used ARMCO2H100C100 CO2 heat pump as heating device.  it has about 1200㎡ need heating. the outlet water temperature is 60℃. Compared with traditionalway, CO2 heat pump can save much electrical energy, and it has outstanding advantage on the environmental protection and energy saving.


Home About ARCO Heating application Refrigeration appliction Intelligence control application Products Consulting Service

The copyright owner is Heilongjiang ARCO Technology Ltd.
黑ICP备15009800号-1

Add:No. 130-2 Nanma Road, Daowai District, Harbin City, Heilongjiang Province
Tel:0451-82804111   Fax:0451-82614111
E-mail: admin@arcochina.com