Factory and office
Current location: Home-Factory and office
Harbin Factory Reconstruction Project
Release time:2015/12/31 9:18:19 Clicks:1726 times 【Return】
The project belongs to the central heatingreconstruction project, the original factoryused coal boiler to meet the demand of heating winter. After reconstruction, we used ARMCO2H100C100 CO2 heat pump as heating device. it has about 1200㎡ need heating. the outlet water temperature is 60℃.
Compared with traditionalway, CO2 heat pump can save much electrical energy, and it has outstanding advantage on the environmental protection and energy saving.